REALIGNMENT & IMPROVEMENTS
The improvements under this contract consist of the construction of four lanes of CR 578 on a new northern alignment that will tie into US 41 at Ayers Road. This project will include an 11-foot multi-use path that will connect to the Suncoast Trail and will accommodate future widening to three lanes in each direction
Construction Cost: $20,155,312.41
CEI of CR 578 from Suncoast Parkway to US 41 at Ayers Road.
CEI of CR 578 (County Line Road) from Suncoast Parkway to US 41 at Ayers Road.

Contract Time: 860 CALENDAR DAYS
Project #'s: FIN# 257298-56201
Counties: Hernando, US-41
This project starts at the intersection of the Suncoast Parkway and County Line Road (CR 578) and continues east to where the new alignment of CR 578 proceeds northward and a new intersection will be created with Trillium Boulevard.



Construction Cost:$20,155,312.41
County Line Rd. will be realigned to meet the new intersection and properties to the south of County Line Rd. will be accessed by the existing road and a cul-de-sac will be constructed at the end. The new alignment proceeds northward through a preset corridor through the Trillium Community and then turns east to US 41 at the existing intersection with Ayers Road. Project elements include: Milling/resurfacing, new roadway construction drainage including ponds, signalized intersections, sidewalk, driveways, striping including thermoplastic and utilities including 12” and 16” water mains.
Ayers Road<br/>Extension
Ayers Road
Extension
GOAA <br />Airport
GOAA
Airport
Hurricane<br />Repairs
Hurricane
Repairs
SunRail Phase II South – Track
SunRail Phase II South – Track
Fl. Turnpike<br />Resurfacing
Fl. Turnpike
Resurfacing
Fl. Turnpike<br/>Ramp & Signing Improvements
Fl. Turnpike
Ramp & Signing Improvements
Fl. Turnpike<br />Reconstruction
Fl. Turnpike
Reconstruction
I-75 Wildwood<br />Interchange
I-75 Wildwood
Interchange