I-75 Wildwood Interchange
Florida’s Turnpike CEI Services for I-75 Wildwood Interchange Modification
Construction Cost: $68,542,000.00
I-75 Wildwood Interchange
Florida’s Turnpike CEI Services for I-75 Wildwood Interchange Modification

Northern Terminus (MP309) and I-75 Widening 4 to 6 lanes
MP 20.8 – SR44 Design/ Build, Sumter County FIN No. 406110-16201 & 406110-26201.

JBS PRIME

Construction Cost: $68,542,000.00
This project consists of widening I-75 in both directions, starting at the north end of the District 5 I-75 Widening project to SR 44. In the interchange, there is the merge of the northbound Turnpike to I-75 and the exit to SR 44. There is a very congestive weave to be navigated by motorists.
Construction for Turnpike northbound ramp will be channelized for a safer exit to SR 44. Conversely, for the truckers and others at SR 44 which have to traverse south on the I-75 southbound which have to make an abrupt weave to southbound Turnpike, the existing ramp will be extended to carry traffic southbound I-75 and a new ramp will be created as a flyover over I-75 to safely conduct traffic to the Turnpike, southbound.

Existing bridge on I-75, northbound and southbound over SR 44 will be modified inside to inside closing the longitudinal space. The ramp will be lengthened northbound from SR 44 to enter I-75. Drainage modifications and ponds to construct.
Ayers Road<br/>Extension
Ayers Road
Extension
GOAA <br />Airport
GOAA
Airport
Hurricane<br />Repairs
Hurricane
Repairs
SunRail Phase II South – Track
SunRail Phase II South – Track
Fl. Turnpike<br />Resurfacing
Fl. Turnpike
Resurfacing
Fl. Turnpike<br/>Ramp & Signing Improvements
Fl. Turnpike
Ramp & Signing Improvements
Fl. Turnpike<br />Reconstruction
Fl. Turnpike
Reconstruction
I-75 Wildwood<br />Interchange
I-75 Wildwood
Interchange