SunRail Phase II South
SunRail Phase II South - Track, Tie, Grade Crossings, Stations, CEI Services
SunRail Phase II South – Track
SunRail Phase II South – Track, Tie, Grade Crossings, Stations, CEI Services FIN No. 423446-96202 (Subconsultant to HNTB)

Provided support for inspection staff, assisted personnel with inspection duties, coordinated material testing with verification personnel, and provided training. Responsible for Pile Driving Operation, safety, settlement, and vibration monitoring. Also, responsible for all concrete operations as well as erosion control. Project also consisted of daily monitoring of erosion control devices, overseeing construction of rail platforms and station sites, rail geometry, fiber optics and crossing construction. .


Construction Cost: $113,653,294.00
Ayers Road<br/>Extension
Ayers Road
Extension
GOAA <br />Airport
GOAA
Airport
Hurricane<br />Repairs
Hurricane
Repairs
SunRail Phase II South – Track
SunRail Phase II South – Track
Fl. Turnpike<br />Resurfacing
Fl. Turnpike
Resurfacing
Fl. Turnpike<br/>Ramp & Signing Improvements
Fl. Turnpike
Ramp & Signing Improvements
Fl. Turnpike<br />Reconstruction
Fl. Turnpike
Reconstruction
I-75 Wildwood<br />Interchange
I-75 Wildwood
Interchange